What We Do

Services

A full rundown of the deck work we take on, from framing to final coat.

Home › Services

Everything we take on

Every job below is one we do ourselves across Bremerton.

Deck Installation

We set footings below the frost line, usually 18 inches down in this soil, and bolt the ledger board to the house with flashing so water can't get behind it. Joists go in at 16 inches on center so the decking doesn't bounce underfoot. You pick pressure-treated lumber, cedar or composite boards for the surface.

Deck Repair

Most repair calls start with a soft spot in the decking or a rail post that's gone loose at the base. We check the ledger board first, that's where rot usually starts if the flashing failed, then work out from there. Sometimes it's a few boards, sometimes we're sistering joists.

Deck Staining & Sealing

We pressure wash first and let the wood dry out for a couple of days before any stain goes on, otherwise it just seals in moisture. Oil-based stains soak in deeper and hold up better against our wet winters than a film-forming product. Plan on recoating every two to three years depending on sun exposure.

Custom Deck Design

If you want a second level off an upstairs slider, a built-in bench along the rail, or stairs that land somewhere other than straight into the yard, we draw it out before we order lumber. We check span tables for the actual load, not just what looks right. Changes are cheap on paper and expensive once the joists are already up.

Composite Decking Installation

Composite boards use a hidden fastener system so there's no screw heads showing on top. It doesn't splinter and you're not staining it every couple of years, but it does run hotter underfoot in direct sun than wood. We'll tell you straight if composite is worth the extra cost for your situation or if cedar makes more sense.

Deck Railing Repair

Building code calls for balusters spaced so a 4 inch sphere can't pass through, and a lot of older decks don't meet that anymore. We reset posts that have rotted at the base, usually where they meet the rim joist, and re-tension or replace cable railing that's gone slack. Loose rails are usually a sign the post itself needs attention, not just the rail cap.

Deck Board Replacement

Cupped or warped boards usually mean water's been sitting on top longer than it should, or the gap between boards was too tight to begin with. We pull the bad boards and replace them without tearing into the frame underneath, as long as the joists are still sound. Matching old cedar to new takes a season or two to weather even.

Multi-Level Deck Construction

Connecting two deck levels means getting the stringers and landing right so the stairs don't feel off. We frame each level separately and tie them back to the house and to each other so there's no give where they meet. More framing means more spots for water to get trapped, so flashing details matter even more here.

Deck Removal & Replacement

We tear out the old deck down to the ledger and take a hard look at what's underneath before building anything new. Half the time the old footings aren't deep enough or the ledger's rotted out, and that changes the whole plan. Old lumber and hardware get hauled off, you don't deal with the dumpster.

Pergola & Covered Deck Construction

A pergola or roof over an existing deck adds real load, posts need their own footings, not just toenailed into the decking. We tie rafters back to the house framing, not just the deck surface, so it holds up in wind. Covered decks also change how water sheds off the house, so we rework the flashing where the new roof ties in.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Bremerton, WA

Deck work available throughout this part of Kitsap County.

Bremerton, WA
Tacoma, WA
Bainbridge Island, WA
Silverdale, WA
Port Orchard, WA
Poulsbo, WA
Gig Harbor, WA
Port Townsend, WA
Belfair, WA
Kingston, WA
Common Questions

Things worth asking

What to expect once a deck project is underway.

Do I need a permit to build a deck?
Most jurisdictions require a permit for any deck more than 30 inches above grade, and some require one regardless of height if it's attached to the house. The permit process usually checks footing depth, ledger attachment and railing height against current building code.
How long does it take to build a deck?
A single-level deck around 300 square feet typically takes one to two weeks from footings to final boards, weather permitting. Multi-level decks, built-in features or composite decking with hidden fasteners add time to both framing and finish stages.
Can a deck be built to a specific budget?
Deck size, footing count, railing style and decking material can all be adjusted to fit a target budget without compromising structural requirements like joist spacing or footing depth. Pressure-treated lumber costs less upfront than cedar or composite, which is usually where budget adjustments start.
Is there a guarantee on deck construction work?
Workmanship on deck construction should be covered by a written warranty separate from any manufacturer's warranty on decking materials like composite boards. Ask what's covered and for how long before signing anything, since coverage varies by contractor.
Who handles communication during the deck project day to day?
On most deck jobs the homeowner deals directly with the crew doing the work or a single point of contact, rather than being routed through an office. That person should be reachable for schedule changes or questions while the job is underway.
What decking materials are commonly used?
Pressure-treated pine, cedar and composite boards are the three most common decking materials, each with different upkeep and lifespan. Pressure-treated lumber costs the least but needs restaining every couple of years, while composite costs more upfront and needs almost none.
Can the yard still be used while a deck is being built?
Most of the yard stays usable during deck construction except for the immediate work area, though equipment, lumber and a dumpster take up some space near the house. Access to a door or slider that the old deck blocked may be limited until the new structure is framed.
What should be done to prepare the site before deck construction starts?
Clearing furniture, planters and grills off an existing deck and moving vehicles away from the work area makes the first day go faster. If an old deck is being removed, utility lines like gas or electrical running underneath should be flagged ahead of time.
What happens if rotted framing is found once an old deck is removed?
Rotted ledger boards, rim joists or undersized footings discovered during demolition get addressed before any new decking goes down, since building over bad framing just hides the problem. This can add cost and a day or two to the schedule, usually as an add-on noted in the original quote.
How should a new deck be maintained?
Wood decks need restaining every two to three years depending on sun exposure, plus an annual check for loose fasteners or soft spots near the ledger board. Composite decking needs occasional washing but no staining, though gaps between boards should stay clear of debris to let water drain.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (206) 466-0731